The ongoing construction on Rainbow Blvd. that has traffic down to one lane in each direction will partially close Ventana Village Road Thursday through Saturday.
The construction of a raw water transmission pipeline is expected to last until mid-September.
The northbound lanes of Rainbow between Ventana Ranch Road and Irving Blvd. will be closed until construction on the pipeline is completed in the fall.
Contact Patti Watson (505-245-3134, pattiw@cwastrategic.com) or Ty Severs (505-245-3138, tys@cwastrategic.com) with questions or concerns about the project.