Beginning Tuesday, Rainbow Blvd. is down to one lane of traffic in each direction.

Northbound Rainbow will be closed until mid-September for construction of a raw water transmission pipeline.

The northbound lanes will be closed between Ventana Ranch Road and Irving Blvd. The pedestrian walkway along the Piedras Marcadas Arroyo will be closed from Rainbow to Universe.

During the construction, traffic will be shifted to the left in the Southbound lanes of Rainbow with one lane of traffic open in each direction. Access to to all businesses and residences will be maintained.

Share.
Kevin Hendricks

Kevin, also known as Steak Sauce, is a reporter for the Neighborhood Journal with a focus on the Ventana Ranch area. He has over 14 years of journalism experience, including reporting, editing and page design.

Comments are closed.

 
Sign up for our newsletters and get the latest Neighborhood news via email!

[ninja_form id='6']